The issue of internal pressure verification during takeover

2009-02-12View Original

Thread Content

I would like to ask: when using SW6 to calculate reinforcement for openings, a window prompt stating that \"the internal pressure check of the pipe fitting fails\" often appears. Does SW6 use GB150 or GB50251 as the standard for performing these calculations? Additionally, according to the scope of application specified in GB150, the inner diameter must be at least 150 mm
Reply #22009-02-12
We are also using SW6, and we have not encountered the issue you mentioned. Could it be caused by incorrect input of the raw data? It’s version 4.0.
Reply #32009-02-12
1. In accordance with GB150; 2. 150mm refers to the inner diameter of the shell, not that of the nozzle
Reply #42009-02-12
SW6 is calculated in accordance with GB150; could the situation mentioned by the poster be due to the wall thickness chosen being too thin?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.