Thread Content
Who are the people from Langfang Pipeline Institute? Please provide a brief introduction – including the status of gas pipeline network construction in the Northeast region and its development plans for the next 5-10 years. I am from Daqing. We have already built pipelines between Daqing and Harbin, as well as between Daqing and Qiqihar. In a few days, Beijing’s leaders will come to listen to the report, but they don’t have the materials yet; are they looking for people everywhere? No need for details; a brief summary is enough. You can get in touch with me, thank you. sunfl@petrochina.com.cn
Here’s a brief overview for your reference: The Northeast Natural Gas Pipeline Project consists of 1 main line, 1 connecting line, 2 branch main lines, 11 branch lines, and gas storage facilities. The total length of the main pipeline from Harbin to Changchun, Shenyang, and Dalian is approximately 950 km, with the section from Harbin to Changchun and Shenyang being 553.5 km long. The section from Shenyang to Dalian is about 390 km long, while the connecting line from Shenyang to Qinhuangdao has a total length of around 413.7 km. The two main branches include Daqing-Harbin and Changling-Changchun-Jihua. The 11 branch lines include Daqing-Qiqihar, Changling-Songyuan, Zhuaji-Harbin, Dalian-Jinzhou District; the Acheng, Anshan, Liaoyang, Fushun, and Benxi branches that are connected to the main lines; and the Jinzhou and Panjin branches that are connected to the connecting lines.