HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What are the things to note when installing 6000 air separation units?

2009-02-14View Original

Thread Content

Our company is installing a new 6000 capacity air separation unit. What issues should be taken into consideration during the installation of such a unit?
Reply #22009-02-14
1. The internal pipelines of the cold box must be thoroughly degreased and protected, and any metal debris resulting from cutting must be removed carefully; 2. The walls of the cold box and its bottom must be welded tightly to prevent leakage and light penetration ; The grounding of the 3 cold boxes’ main towers and the argon towers should be separated from the lightning and static electricity protection grounding of the cold box walls, with connections made to different wires ; After cleaning away the metal debris, weld the 4 main towers together ; 5. Oil is prohibited in the fillers of air-cooled and water-cooled towers; crushing the fillers before installation is also forbidden ; 6. When loading the molecular sieve into the purifier, it should be done on a sunny day; the powder present in the molecular sieve must be removed, the filter screen of the bed layer must be secured properly, and the gaps should be filled tightly with asbestos rope ; Oil is strictly prohibited in the 7-oxygen pipeline and the pipelines leading to the air separation system ; This post was last edited by Longsky Eagle on 2009-2-14 09:15]

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.