HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What instrument equipment needs to be calibrated before on-site installation? Are there any standard regulations?

2009-02-15View Original

Thread Content

What instrument equipment needs to be calibrated for on-site construction? Are there any standard regulations? I know there are flow meters, safety valves, pressure gauges, and things like that, but I’m not from this field. I’d like to know more specific details. Thank you.
Reply #22009-02-15
Refer to the \"Technical Specifications for the Construction of Petrochemical Instrumentation Projects\" SH/T3521----2007
Reply #32009-02-15
Flow meters, thermocouples, thermal resistors, thermometers, pressure gauges, etc. need to be calibrated by a qualified metrology department, while transmitters (pressure transmitters, differential pressure transmitters, level transmitters, etc.) and various instruments in the control room can be calibrated by the installation unit itself.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.