HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Startup cycle for gasoline hydrogenation

2009-02-15View Original

Thread Content

Recently, a set of gasoline hydrogenation units at our company is set to be put into operation. I would like to know how long the commissioning period for gasoline hydrogenation units is; everyone is welcome to share their opinions!
Reply #22009-02-15
For those who perform well, the maximum duration of one cycle can reach 8 years.
Reply #32009-02-15
The driving cycle mentioned by the poster probably refers to a newly installed unit, namely the time required from the completion of construction to the production of qualified products through pipeline purging. If that’s the case, it will probably take 2–3 months.
Reply #42009-02-15
Could you explain it in more detail? I want to know too.
Reply #52009-02-15
It mainly depends on the catalyst’s activity; there are also factors that affect catalyst activity, such as the properties of the raw materials and the parameters of process control.
Reply #62009-02-17
Is it the steam-assisted hydrogenation desulfurization process technology from the Fuyan Research Institute? . . . :lol
Reply #72009-02-17
In the case of the catalytic deep selective hydrogenation desulfurization units developed by the Fuyan Research Institute, since the hydrogenation pressure is generally between 1.6 MPa and 2.5 MPa, it falls under low-pressure hydrogenation; the service life of the catalysts is usually 3 to 5 years, with some reportedly capable of lasting up to 8 years. . . As for the safe operating cycle for device production, I think it varies from factory to factory and depends on the condition of the equipment. . . Generally, three to two years is no problem. . . Normally, it involves routine maintenance of rotating or automated equipment and the replacement of wearable parts. . . . :lol

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.