HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How is automatic control of train loading at refineries achieved?

2009-02-15View Original

Thread Content

The most recent job I had was to fill trains with gasoline and diesel. I’m wondering if any of you know anything about this process? The main issues are as follows: 1. Under normal circumstances, how many flexible hoses are used per loading, and what should be the flow rate for each hose? Of course, a centrifugal pump is used to supply oil to these risers ; 2. How is oil spill control achieved? The front end of the flexible hose is equipped with an electro-hydraulic valve and a flow meter. When the oil in the first loading hose is in place, the electro-hydraulic valve closes; at this point it is necessary to open a new hose, otherwise the flow rate in the other hoses will increase. How can this be achieved? Or in the event of an accidental oil spill at the flexible hose connection, should interlocking be used to stop the pump? …

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.