2009-02-15View Original

Thread Content

During the construction of our factory, since the liquid ammonia storage tank was located quite far away from the factory complex, about 2 kilometers away, the pipelines had to pass over road trusses as they reached the tank. I would like to ask the pipeline designers: when conducting strength and leakiness tests on the liquid ammonia pipelines using water as the testing medium, is it required by standards to install high-point vents and low-point drains? If such vents and drains are indeed necessary, could they pose a safety hazard in the future? How does your own factory handle this issue? This post was last edited by WANGCHANGS on 2009-2-15 at 22:44
Reply #22009-02-16
If a hydraulic test specimen is used, a drain valve at the lowest point is essential; a blind flange can be installed behind the drain valve after use.
Reply #32009-02-17
Liquid ammonia is volatile, so both high-point venting and low-point discharge are essential.
Reply #42009-02-18
It is necessary to carry out venting at high points and discharge at low points, but it is essential to properly manage these venting and discharge points after pressure testing. In one of our company’s pipelines, poor management of such points led to an oil leakage accident, which had serious consequences. It is best to reduce the number of these points after pressure testing, and seal off some of the vent points. For those that are not used regularly, blind plates should also be installed.
Reply #52009-02-18
Based on what you’ve described, it is necessary to add facilities for venting at high points and discharging at low points; however, during normal operation, proper management of these facilities for venting and discharge must be ensured. The specific approach to handling this will depend on whether such high-level venting and low-point discharge facilities are still needed during future operation, during maintenance, or after pipeline replacement. :lol
Reply #62009-02-18
Low-point discharge and high-point venting should be provided; if not, purge ports must be added at both ends of the pipeline to ensure that the material is thoroughly purged when it is not in use.
Reply #72009-02-18
Add blind flange:lol :lol :lol :lol
Reply #82009-02-18
Ventilation at high points and drainage at low points are essential; otherwise, air pockets and dead ends can form. After use, a blind flange should be installed to prevent any safety hazards.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.