HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is it good to reasonably cancel the block restrictions of each process unit in the petrochemical unit design and production technology management?

2009-02-16View Original

Thread Content

Is it good to reasonably cancel the block restrictions on each process device? In order to save ground occupation and achieve centralized control, is it reasonable to merge the original installation blocks? What are the restrictions?
Reply #22009-02-16
It's reasonable, as long as the installation blocks are merged properly and don't affect each other. All our company's devices are located in one large control room
Reply #32009-02-17
Investment can be reduced, but the installation can only be started and stopped at the same time, otherwise the fire protection distance is not enough
Reply #42009-02-17
Upstream and downstream devices closely related to the process can be combined in a reasonable sequence and arranged into a set of devices. . . and use a centralized control room. . . It is managed as a single series of refining and chemical production lines. . . :lol

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.