Thread Content
I’m asking for everyone’s advice; since I’m not from a civil engineering background, I don’t quite understand it
It’s not clear what specific question the original poster has regarding costs. To put it simply, for civil engineering costs, specialized cost estimators are usually hired; these tasks are separated from those related to design, construction, and supervision. The reasons for this are as follows: A. The various components of construction work can be broken down into items such as formwork, rebar, concrete, earthwork, and machine usage, meaning there are many elements to consider when estimating costs. B. Different regions have their own set of standards for each of these components; for example, there are specified rates for the use of bulldozers per day. Cost estimates must adhere to these local standards, so it’s necessary to be well-versed in these regulatory documents. C. It’s also important to be familiar with the prices of building materials. D. In the case of geotechnical work, designers need to provide preliminary cost estimates. For instance, for foundation support using 3 bundles of 7Ф5 steel cables in holes with a diameter of Ф130, the estimated cost per meter is around 130–150 RMB. However, it’s common for budgets to exceed these estimates, and ultimately, when calculating the design fees (which are typically a certain percentage of the total cost), it’s still necessary to have specialists carry out thorough calculations. So, there are many aspects related to cost estimation, and there are also exams for certified cost engineers. Therefore, if the original poster is not sure about what specific aspects of cost estimation need to be understood, it is recommended to find a review book for certified cost engineers and go through the sections related to those areas of interest. This post was last edited by tpjj on 2009-2-17 00:16