HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Use of SW6 during the quotation phase

2009-02-17View Original

Thread Content

During the inquiry phase, how did everyone use SW6? Are there any tips that everyone can learn*and share?
Reply #22009-02-17
It depends on the level of detail required for your inquiry – it’s definitely the usage depth of SW6^_^
Reply #32009-02-17
For example, in the case of heat exchangers, basic parameters such as the wall thickness of the cylinder, the thickness of the end caps, the thickness of the tube sheet, and the thickness of the flanges are required; Total weight ; In short, avoid setting prices that are too absurd, while also not investing too much effort.
Reply #42009-02-17
1. I think using LANSYS for heat exchangers is much more convenient than using SW6; 2. When requesting a quote, only weight and material matter; once those are known, and provided it’s not some special type of heat exchanger, it’s not difficult to determine the price.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.