HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Layout of drainage pipes in the tank area

2009-02-17View Original

Thread Content

In chemical storage areas, when installing drainage pipes, what distance should the pipes be from the retaining dike? Are there any regulations? Are there any precautions to take when installing a water seal well at the cofferdam drainage outlet? Please help, thank you!
Reply #22009-02-17
1. The piping layout must be orderly and not obstruct the passages within the tank area; it should preferably be arranged in the same direction throughout the tank area, and must not be placed on the fire dike of the tank area. 2. Pay attention to the elevation of the tank area to ensure that water can drain smoothly.
Reply #32009-02-18
Are there any precautions to take when installing a water seal well at the cofferdam drainage outlet? There are specific regulations in this field of waterways or firefighting.
Reply #42009-02-24
It is understood that when arranging the pipes, it is necessary to ensure that they do not affect the fixation of the building’s foundation; there is a calculation related to the angle involved, but it is unclear what that angle is

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.