Problem with thermal insulation support. Waiting online. Urgent

2009-02-17View Original

Thread Content

I want to create a tank with a diameter of 3600 and a height of 4500. The thickness of the insulation layer should be 50. I plan to use 40*6 flat steel bars, cut into sections 45 long; each section will have holes with a diameter of 10, which will serve as handles for the insulation. I would like to know what the appropriate spacing is between these holes – how far apart should they be welded, and what’s the spacing along the height? Is that flat steel placed vertically or horizontally? Waiting online, urgently
Reply #22009-02-17
Weld one every 200–250 mm; the height interval is the same in both the vertical and horizontal directions. The flat steel bars are welded upright, at a thickness roughly equivalent to that of the insulation layer.
Reply #32009-02-17
It is recommended to install them directly using insulation rings, with the spacing determined by the hardness of the insulation material. For soft insulation materials, the spacing is usually between 500 millimeters and 800 millimeters; for semi-hard materials, it is 1000 millimeters or 1500 millimeters. In the case of hard insulation materials, the spacing can be 2000 millimeters or 2500 millimeters. Since these are insulation rings, the wide side of the flat iron should naturally be parallel to the ground. Please refer to the guidelines on insulating pipes and equipment. Last edited by Albertlu on 2009-2-18 at 19:51.]
Reply #42009-02-17
Use flat steel? Haven’t heard of it. 1. The end of the #10-12 round steel bar has a groove; it is used on welding equipment. 2. The spacing depends on the dimensions of the insulation panel. 3. Is it necessary to fix wire mesh on the outside? . . The wire mesh is fixed to the rebar
Reply #52009-02-18
Another simple method is to weld iron wires to the device, with a length of around 80 MM and a spacing of 400 MM. This method is applicable to cases where the equipment does not have a insulation ring.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.