When designing a heat exchanger for the first time, many details need to be taken into consideration

2009-02-19View Original

Thread Content

A few days ago, I designed a horizontal condenser (with cooling water on the tube side). Since the team leader was not available, I asked someone else to review it, and after approval it was put into production. As a result, today the team leader saw the drawings and said that the rear pipe box lacks exhaust and drain holes, which need to be added. Is this important? I also saw people in the forum discussing opening drainage holes in the partitions; it seems I don’t have those in my original drawing either. Under what circumstances must these be turned on, and is it related to the medium? Are all heat exchange equipment necessary? Also, how should the dimensions of these components be determined? That’s about it; I got scolded today, so my words are a bit messy. Dear readers, please help out:hug:
Reply #22009-02-19
It indeed should be there, in order to exhaust air and liquid during pressure testing.
Reply #32009-02-20
It’s okay; it’s inevitable to make mistakes at first. As time goes by and experience increases, one will be able to handle things on their own. Now is the time to be humble and keep learning. I remember that when I designed a pressure vessel buffer tank for the first time, I forgot to consider the reinforcement of the manhole and the inlet pipes inside the tank. It’s fine; everything will work out in the end. As for the vent holes and drain holes, it seems they are necessary. The reason is the same as mentioned above.
Reply #42009-02-20
It should be there. You seem to be doing well. Are you at that design firm or an equipment company? Study hard*, I hope you’ll do well in the future. I learn from you*. There are books and materials on pressure vessels – please share some with me. Thank you! ! ! !
Reply #52009-02-20
An exhaust vent should be installed at the highest point; A drain hole is provided at the lowest point.
Reply #62009-02-20
An exhaust vent is provided at the highest point; A drain hole is provided at the lowest point
Reply #72009-02-20
Exhaust and drain ports generally need to be provided, usually using threaded nozzles and plugs with a small diameter (such as G3/4”).
Reply #82009-02-20
I changed the drawings today; previously the team leader had a set of drawings for reference, and it was my own lack of attention to detail. What the person upstairs said is correct – I used pipe plugs in accordance with GB/T 3287-2000
Reply #92009-02-21
Vent holes and drain holes are generally provided to remove air and liquid during hydrostatic testing or when the machine is shut down. The openings in the partition plates serve two purposes: one is to allow fluid drainage, and the other is to maintain pressure balance while the equipment is in operation.
Reply #102009-02-21
The size of the drain port is related to the diameter of the equipment. The larger drain ports also use DN25. :)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.