1. The reinforcement ring of the pressure vessel should be provided with at least one leakage signal indication hole with a diameter not less than M6. () 2. Working pressure refers to the highest pressure that may occur at the top of the vessel under normal operating conditions. ()
Reply #22009-02-20
1. The reinforcement ring of the pressure vessel should be provided with at least one leakage signal indication hole with a diameter not less than M6. (√) 2. Working pressure refers to the highest pressure that may occur at the top of the vessel under normal operating conditions. (√)
Reply #32009-02-20
1. The reinforcement ring of the pressure vessel should be provided with at least one leakage signal indication hole with a diameter not less than M6. (√) 2. Working pressure refers to the highest pressure that may occur at the top of the vessel under normal operating conditions. (√)
Reply #42009-02-20
From a standard perspective, the signal hole in question 1 should be M10, so it is wrong. As a digression, I personally think M6 is also guaranteed. The second question is correct.
Reply #52009-02-20
1. The reinforcement ring of the pressure vessel should be provided with at least one leakage signal indication hole with a diameter not less than M6. (True) 2. Working pressure refers to the highest pressure that may occur at the top of the vessel under normal operating conditions. (right)
Reply #62009-02-20
All right, I guessed:$ :$
Reply #72009-02-20
1. The reinforcement ring of the pressure vessel should be provided with at least one leakage signal indication hole with a diameter not less than M6. (Correct) 2. Working pressure refers to the highest pressure that may occur at the top of the vessel under normal operating conditions. (correct)
Reply #82009-02-20
1. Correct, Article 53 of the "Rules" has relevant provisions. 2. Correct, there are relevant provisions in GB150-19983.4.2.
Reply #92009-02-20
My answer is: 1. (correct) ; 2. (Correct) The reason for the first question is: Article 53 of the "Pressure Vessel Safety Technical Supervision Regulations". The reason for the second question is: GB150-98DEI 3.4.2.
Reply #102009-02-20
1. (correct); 2. (correct)
Reply #112009-02-20
1. The reinforcement ring of the pressure vessel should be provided with at least one leakage signal indication hole with a diameter not less than M6. (√) 2. Working pressure refers to the highest pressure that may occur at the top of the vessel under normal operating conditions. (√)
Reply #122009-02-20
1. The reinforcement ring of the pressure vessel should be provided with at least one leakage signal indication hole with a diameter not less than M6. (True) 2. Working pressure refers to the highest pressure that may occur at the top of the vessel under normal operating conditions. (right)
Reply #132009-02-20
1. The reinforcement ring of the pressure vessel should be provided with at least one leakage signal indication hole with a diameter not less than M6. (True) 2. Working pressure refers to the highest pressure that may occur at the top of the vessel under normal operating conditions. ( right)
Reply #142009-02-20
1. Correct. The reinforcing ring installed on the pressure vessel by welding and the surrounding continuously welded reinforcing pad should be equipped with at least one leakage signal indication threaded hole no smaller than M6 2. Correct. See GB150 3.4.2
Reply #152009-02-20
1. True. 2. False. It should be that the maximum working pressure refers to the highest pressure that may occur at the top of the container under normal operating conditions.
Reply #162009-02-20
1. The reinforcement ring of the pressure vessel should be provided with at least one leakage signal indication hole with a diameter not less than M6. (√) 2. Working pressure refers to the highest pressure that may occur at the top of the vessel under normal operating conditions. (√)
Reply #172009-02-20
My answer is: 1. (√) 2. (√) The reason for the first question is: Article 53 of the "Pressure Vessel Safety Technical Supervision Regulations". The reason for the second question is: GB150-98DEI 3.4.2.
Reply #182009-02-20
1. The reinforcement ring of the pressure vessel should be provided with at least one leakage signal indication hole with a diameter not less than M6. Correct 2. Working pressure refers to the highest pressure that may occur at the top of the container under normal operating conditions. correct

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.