Why is a substation required for each turbine cycle machine in the synthesis section?

2009-02-20View Original

Thread Content

In the ammonia synthesis section, each of the four turbine cycles is equipped with a substation – is that because of the special nature of these turbines?
Reply #22009-02-20
Yes, since turbines are large electrical devices, they require dedicated power distribution cabinets, and the same is true for compressors. You can take a look at the compressors – each one also has its own separate power distribution cabinet.
Reply #32009-02-20
One transformer per unit, and the distribution panels can be combined in one distribution room.
Reply #42009-02-20
It’s probably because of the high power of the turbines (680 kW each); maybe one transformer isn’t enough.
Reply #52009-05-02
Generally, distribution rooms are divided into high-voltage distribution rooms and low-voltage distribution rooms, and these two types are separate from each other

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.