Everyone knows that a thermometer is installed at the outlet of the heat exchanger or cooler. I would like to discuss or understand with you whether the thermometer should be installed in front of the outlet valve of the cold exchange equipment or after the valve? When I looked at some PID diagrams, I found that there was no good standard or anything. I didn't know whether this was wrong or right. Is there any basis for installing the thermometer in front of and behind the valve? What are the advantages and disadvantages of such a device? Please share your experiences with sea friends in the sea.
Reply #22009-02-21
personal opinion: It should be installed after the outlet valve. First, heat exchangers or coolers are generally pressure vessels, and holes or welding on the vessel interface pipes cannot be made casually. Second, temperature is an indicator to evaluate the heat transfer effect of the heat exchanger or cooler, and it is best to install it slightly away from the container.
Reply #32009-02-21
personal opinion: It should be installed after the outlet valve. First, heat exchangers or coolers are generally pressure vessels, and holes or welding on the vessel interface pipes cannot be made casually. Second, temperature is an indicator to evaluate the heat transfer effect of the heat exchanger or cooler, and it is best to install it slightly away from the container. I don't know if this view of the original poster is correct, but I always feel that your first point is understandable, but I don't quite agree with or understand the second point. If it is a little farther away from the container, the temperature of changing the number is not the temperature after the heat exchanger. It may be affected by the outside world and the error will be greater. Also, are the temperatures of the cooler and the heat exchanger installed different? Is one installed in front of the valve and the other behind the valve?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.