HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Lianyou’s original driving plan

2009-02-21View Original

Thread Content

The original start-up plan of Lianyou 1. Contact an electrician to go to the site to check that the backup cycle machine of the synthesis tower electric furnace is well insulated 2. Contact the instrument specialist to go to the site to check that all instruments display normally 3. Check the fresh gas valve; Open the large passage, vent the valve, close the alcohol vent valve, and open the main valve. Report to the team leader 4. Contact the dispatcher to ensure that the oil separation ammonia washing tower sewage replacement of the gas generation system is qualified. 5. Pressurize the system and replace it, and the pressure increase rate is ≤ 0. 4mpa/M³ 6. Open the main valve of each tower, the vent valve behind the tower, close the auxiliary valve of the tower, open the inlet and outlet of the circulation machine, and replace it with the vent valve twice. 7. Sampling and analyzing O2

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.