HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Basic process parameters for coking in a 4×50-hole regenerative coke oven with a carbonization chamber height of 7.63 m

2009-02-23View Original

Thread Content

Effective volume of the carbonization chamber: 76.25 m3 per chamber. Density of the coal load in the carbonization chamber (dry): 0.75. Amount of coal loaded per chamber (dry): 57.19 t. Yield of dry coke per chamber: 42.6 t. Annual output of the coke oven: 2,961,714 t. Turnaround time of the coke oven: 25.2 hours. Number of working days per year for the coke oven: 365 days. Operating coefficient under stress conditions: 1.07. Moisture content of the coal used for charging: 10.5%. Gas production rate: 330 m3/t. Coke formation efficiency from dry coal: 74.5%. Lower calorific value of the gas used for heating the coke oven: 16,720 kJ/m3 for coke oven gas, and 4,187 kJ/m3 for mixed gas. When the moisture content of the coal used for charging is 7% and the volatile matter content on a dry basis is 24.5%, the heat required to process the wet coal for coke production is: 2,387 kJ/kg when using coke oven gas, and 2,512 kJ/kg when using mixed gas

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.