Thread Content
For Project 3052, regarding safety assessment and environmental impact assessment, what are the tasks involved, which steps are required, and what information needs to be collected? ?
List of general documents required for environmental impact assessment: 1. Plant layout plan, total investment, environmental protection investment, project overview (project proposal or feasibility study report); 2. Detailed description of the production process along with flow diagrams, main production equipment (model and quantity); 3. Consumption of raw materials and auxiliary materials, energy consumption, test reports on the composition of these materials; 4. Material balance sheets and water balance diagrams; 5. Number of employees, working shifts, number of production days, information on the surroundings of the plant site; 6. Analysis of pollution generation sources: ⑴ Sources of exhaust gases, amount of exhaust gas generated, main pollutants in the exhaust gas (including concentration and volume), measures and facilities for treating exhaust gas (investment, model, quantity, treatment efficiency), amount of exhaust gas emitted, emission concentrations of main pollutants, flue gas temperature, height and diameter of exhaust stacks; ⑵ Water consumption (amount of fresh water used, amount of recycled water, recycling rate), sources of wastewater, amount of wastewater generated, main pollutants in wastewater (concentration and volume), measures and facilities for treating wastewater (investment, model, quantity, treatment efficiency), amount of wastewater emitted, emission concentrations of main pollutants, destination of wastewater; ⑶ Sources of noise, noise reduction measures (investment, model, quantity); ⑷ Sources of solid waste, amount of solid waste generated, nature and composition of solid waste, measures for disposal or utilization, amount of solid waste emitted