HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Operation process of smoke exhaust vehicle

2009-02-24View Original

Thread Content

I. Operation process of the smoke guide vehicle: Furnace terminal platform, operation alarm, movement to the coal loading chamber; the U-shaped tube is aligned with the coal loading hole, the U-shaped tube descends, the water seal cover is opened, operations on the rising tube are carried out, cleaning of the rising tube is initiated, smoke guidance is completed, the water seal cover is closed, the U-shaped tube is raised, all mechanisms return to their original positions, operation alarm, movement to the terminal platform
Reply #22009-02-26
Does the original poster have the operating procedures for the smoke exhaust vehicle? ? ?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.