HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Coke oven gas transportation problem.

2009-02-24View Original

Thread Content

In a coking plant with an annual output of 800,000 tons, the coke oven gas must be transported 750 meters to produce methanol externally. Should a separator be installed along this 750-meter route? The pipeline is DN1000.
Reply #22009-02-25
Separator---what does it mean? Does it mean water seal?
Reply #32009-02-25
I am also very interested in the topic you are talking about. Please tell me in more detail. Do you want to separate the water in the gas or pressurize it? ?
Reply #42009-03-01
Everyone is interested in producing methanol from coke oven gas, and so am I, but now the economic crisis has made it difficult to do so.
Reply #52009-03-01
I think such a long pipeline must have a heating pipe, otherwise it will easily get clogged in cold weather. A separator should be installed, otherwise the condensed water will block the pipeline and cause poor air supply. Originally, the coke oven gas pressure was not high.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.