For work purposes, we kindly request those who are aware of this to provide an approximate timeline for the construction and handover of the wharf and tank farm structures, as well as the typical duration required for the installation and commissioning of the internal equipment and facilities. Civil engineering components can be divided into the pier control building, substation, high-voltage switchyard, fire water station (pump house), boiler room, vehicle loading and unloading facilities, tank farm, etc.
Reply to huamei461112: The request is regarding how long the reasonable construction period should be for the installation and commissioning of various devices within the civil engineering structure.
This issue is quite complex and is closely related to factors such as funding. With sufficient funds, everything becomes easier. Our company is progressing slowly due to a lack of funds, and there’s no way to talk about any plans.
There are various constraints related to funds, the levelness of the ground, the weight of equipment, etc., and it is also affected by climate. Generally speaking, the duration required for construction varies depending on the scale of the project. In terms of civil engineering work, if construction starts after May, excluding rainy days, there should be about 4 months of optimal construction time, which also corresponds to the operational practices of each company.
To develop an effective storage and transportation plan, the following information is required: 1) The scale of the project, including the volume of work involved in dock construction as well as the available social infrastructure; the size of the storage area and the condition of its facilities. 2) The construction management approach, whether it is a turnkey contract or some other method. 3) Information regarding the weather conditions and geographical location of the project site. 4) The status of material supply