HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Q&A on Coking Production – Heating Regimes for Coking Ovens

2009-02-28View Original

Thread Content

The heating schedule refers to the temperature and pressure regimes that need to be controlled or adjusted during the heat treatment process. For example: coking time, standard temperature, gas flow rate, flue draft, regenerator top draft, soot hole pressure, air inlet opening, air excess factor, orifice plate diameter, and collector duct pressure, etc.
Reply #22009-02-28
Such posts aren’t very meaningful, are they?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.