Pickling and rust removal for turbine and industrial boiler pipes?

2009-03-02View Original

Thread Content

Which process pipelines in steam turbines and industrial boilers require pickling to remove rust?
Reply #22009-03-04
Mainly, the medium-pressure steam pipeline leading into the turbine needs to be acid-washed and then subjected to steam blasting
Reply #32009-03-04
The steam pipelines leading into the turbine must be pickled and then blasted to prevent weld slag from entering the turbine and damaging the impellers
Reply #42009-03-04
To enter the turbine lubricating oil pipeline, pickling is required. Pickling is carried out after pressure testing and purging; following pickling, passivation, rinsing, and air drying are necessary, and shot blasting is not required
Reply #52009-03-05
The oil pipeline is not necessary, but the steam pipeline must be properly installed; passivation is not required for the steam pipeline

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.