HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Steaming of synthesis tower

2009-03-02View Original

Thread Content

Our synthesis tower is a steam-rising type. The water flows through the tube side and the catalyst is installed in the shell side. When we are doing the preparation work, how do we cook the synthesis tower? Do we need to cook both the tube side and the shell side? Thanks!
Reply #22009-03-03
If it is a methanol synthesis tower, there is neither a cooking tube side nor a cooking shell side. In the shell cooking process, the catalyst is scrapped. ; In the cooking tube side, water flows inside, so there is no need to cook it. This post was last edited by FEIJING on 2009-3-4 16:08 ]
Reply #32009-03-03
What to do with the things inside that can’t be blown out? There is rust etc. Isn't it easy to generate carbonyl iron?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.