HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Key points for preheating operation in the urea synthesis tower

2009-03-03View Original

Thread Content

Key points for preheating operations of the synthesis tower: 1. Contact the instrumentation team to turn on the computer and check the temperatures at various points in the synthesis tower. 2. Since the temperature measurement points in the synthesis tower are located at considerable distances from each other, when the temperatures at the lower measurement points are not equal, do not rush to increase the steam supply, to avoid excessive temperature rise that could damage the synthesis tower. 3. It is strictly prohibited to open and close the steam valve sharply. 4. During the preheating process, the temperature difference between the inner and outer walls of the synthesis tower should be maintained at 50°C or less

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.