HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Request for the staffing and allocation for producing 100,000 tons of methanol per year from coke oven gas.

2009-03-04View Original

Thread Content

Personnel allocation and distribution for producing 100,000 tons of methanol per year from coke oven gas
Reply #22009-03-06
For the main operators of each position, except for 2 people in the conversion process, there is 1 operator for everything else. The main compressor operator is on-site in the DCS control room; there are 3 operators for wet desulfurization, 3 for compression, 5 for refined desulfurization in the conversion process, 1 for synthesis, 2 for distillation, and 1 for deoxygenation. All these are auxiliary operators

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.