Some actions during the commissioning process

2009-03-04View Original

Thread Content

keys: Enable-Regulate device-Driving equipment-Electricity available Translation: Start- regulate facility -driving equipment -electricity available Please check the English translation. Original text: Enable all instruments, regulate the device and driving equipment, and supply electricity. This post was last edited by niulijun117 on 2009-3-11 14:28.]
Reply #22009-03-04
Turn on all instruments, control devices, and transmission equipment and supply power to them. Turn on all instrumentation, regulating & driving devices prior to power on.
Reply #32009-03-05
Turn on all instruments, regulating devices, and driving equipment before powering them on.
Reply #42009-03-06
The energization of a noun can be expressed as “energization”
Reply #52009-03-07
Turn on all instruments, regulating devices, and driving equipment before powering them up. Activate all such devices prior to supplying electricity.
Reply #62009-03-07
I think this one is better. Turn on all instrument, regulating & driving equipment prior to energization.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.