HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

A process operation question

2009-03-05View Original

Thread Content

What is the start-up and shutdown sequence for the slag cooler? Start-up: A Adjust the required rotation speed; B Open the water outlet valve after filling with water; C Supply material; E Open the water inlet valve; D Start the motor. Shutdown: A Cut off the power supply; B Stop supplying material; C Drain all the material and set the rotation speed to “0”; D Wait for 30 minutes before closing the water outlet valve and water inlet valve
Reply #22009-03-05
1. Start CBDA 2. Stop BCDA
Reply #32009-03-05
1. Start CBDA. 2. Shut down BCDA.
Reply #42009-03-05
Start is CBDA, Stop is BCAD
Reply #52009-03-05
CBDA and BCAD seem quite simple, even if you’re not very familiar with the procedures involved. .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.