I just started handling the coordination of chemical construction projects this year. How can I adapt to this work as quickly as possible and do it well? This post was last edited by laiqi on 2009-3-6 14:22]
In project management, communication and coordination serve as the link for managing all aspects, establishing connections between people, ideas, and information. They are essential and highly important for the success of a project. Communication and coordination enable the conflicting aspects to be integrated into a unified whole, ensuring a balanced system structure and smooth project implementation and operation. Keywords: project management ; Communication ; Coordination: Modern projects involve many participating parties, resulting in a complex project structure. Each party has its own tasks, objectives, and interests, and they all attempt to guide and interfere in the project’s implementation process. In projects, conflicts of organizational interests are more intense and irreconcilable than those among different departments within a company. Project managers must bring all parties together to work in coordination, which highlights the importance of communication and coordination in project management. Communication is a means of organizational coordination and a fundamental method for overcoming barriers among organizational members. The degree and effectiveness of coordination often depend on the level of communication among the participants in each project. In project management, emphasis should be placed on the following aspects of communication and coordination: coordinating internal interpersonal relationships. The project management team led by the project manager constitutes the core leadership of the project organization. Typically, the project manager does not directly control resources and specific tasks; instead, functional staff within the project management team are responsible for carrying out such control. This results in boundaries and coordination existing between the project manager and the functional staff, as well as among the various functional staff members. The coordination tasks of the project manager include: 1. Communication between the project manager and technical experts. Technical experts often have little understanding of the specifics at the grassroots level; they focus only on optimizing technical solutions, pay attention to numerical values, are overly optimistic about the feasibility of such technologies, and neglect the social and psychological impacts. The project manager should take an active role in guiding things, leveraging the skills of technical personnel, while also paying attention to the overall situation, comprehensiveness, and the feasibility of plan implementation. Establish a comprehensive and practical project management system. Clarify each person’s responsibilities, design a comprehensive management process, and specify the official methods, channels, and timing for communication within the project, so that everyone acts in accordance with procedures and rules. Establish a project incentive mechanism. Due to the characteristics of the project, the project manager should pay more attention to motivating each team member from the perspectives of psychology and behavioral science. For example: adopt the work style of migrant workers, and avoid being arbitrary ; Improve working relationships, show concern for all members, and treat people politely ; Handle matters in an open, fair, and impartial manner ; When submitting reports to superiors and relevant departments, evaluations and assessments of the project team members should be included, and members who have performed outstandingly should be recognized upon the completion of the project. Form a relatively stable project management team. Enterprises that operate on a project basis should have a relatively stable project management team; in this way, although projects are one-time and constantly new, the project team remains stable, with its members knowing each other well, which helps to **reduce friction within the project. Establish fair and impartial methods and standards for evaluating performance, and conduct regular, objective, and thorough assessments of members’ performance, while eliminating factors such as randomness, uncontrollability, and unpredictability. 2. Coordination of the relationship between the project management team and the enterprise’s management layer: The coordination of this relationship relies on strict implementation of the project management target responsibility document. The project management department operates under the guidance of the relevant functional departments and units within the enterprise; it represents both a hierarchical administrative relationship as well as a relationship of service and obedience, supervision and execution. In other words, the regulatory system for production factors at the enterprise level must serve to optimize the allocation of production factors at the project level, while the dynamic management of project-related production factors must be subject to the macro-control by the enterprise’s higher-level management authorities. The enterprise must exercise necessary supervision and control over the entire project management process, and the project management team must, in accordance with the responsibility agreement signed with the enterprise, fulfill its duties conscientiously and go all out to ensure the proper implementation of the project. 3. Coordination between the project management team and the client: The client represents the owner of the project and holds special rights over it; to ensure the success of the project, it is necessary to obtain the client’s support. The project manager must first understand the overall objectives and the client’s intentions by reading the contract or project scope document repeatedly. Project managers who are not involved in the project decision-making process must understand the basis, origins, and underlying reasons behind the project concept, as well as the background related to goal setting and decision-making; otherwise, they may have an incomplete or even incorrect understanding of the goals and tasks at hand, which can pose significant difficulties for the work. If the project management and implementation do not meet the expectations of top management or the client, the client will intervene to change this situation. Therefore, the project manager must make significant efforts to understand the client’s intentions and the project objectives. Involve the client in the entire project process, rather than just delivering a completed project to them. Despite having predetermined goals, the project implementation must follow the employer’s instructions to satisfy them. The client is usually a person from another specialty or field who may know very little about the project. A good way to address this issue is to help the client understand the project and its implementation process, thereby reducing unnecessary interference ; When making decisions, the project manager must take into account the client’s expectations, stay aware of the pressures the client is facing, as well as the client’s priorities regarding the project ; Respect the client and keep them informed at all times ; Enhance planning and foresight, so that the client is aware of the consequences of contractor and non-procedural interventions. Project managers sometimes encounter situations where other departments affiliated with the client or various partners try to provide guidance on the project at the same time, which is extremely challenging. The project manager should listen carefully to the advice of these people and provide them with patient explanations, but should not allow them to directly guide the implementation or direct the members of the organization. Otherwise, there is a risk of serious damage to the overall effectiveness of the entire process. An effective way for the project management team to coordinate relations with the employer is to implement the contract. 4. Coordination of the relationship between the project management department and the supervision agency: The project management department should provide the supervision agency with information regarding production plans, statistical data, and reports on engineering accidents in a timely manner. It must accept the supervision and management of the supervision unit in accordance with the provisions of the \"Code for Supervision of Construction Projects\" and the requirements of the construction contract, and ensure good cooperation. The project management team should fully understand the nature and principles of supervision work, respect the supervisors, actively cooperate with their efforts, always adhere to the principle of shared goals between the two parties, and work proactively. During the cooperation process, the project management team should pay attention to on-site visa procedures. In cases of design changes, material substitutions, special construction methods, or concealed work, such changes must be approved by the supervising personnel in a timely manner, and written documentation should be prepared to minimize conflicts with the supervising staff. The project management team should organize construction strictly to avoid sensitive issues arising during the work. When there are disagreements with the supervision personnel, both parties should, on the premise of further cooperation, engage in consultations based on the principles of mutual understanding and cooperation, and the project management team should respect the final decision of the supervision personnel or supervision agency. 5. Coordination of the relationship between the project management department and the design unit: The project management department should work closely with the design unit during stages such as design briefings, drawing reviews, design discussions and changes, foundation treatment, inspection of concealed works, and final acceptance. It should also accept coordination from the client and the supervision engineer regarding the relationship between the two parties. The project management team should focus on communicating with the design firm; it should proactively discuss any issues present in the design, actively support the work of the design firm, and at the same time seek their support as well. During the design briefing and drawing review processes, the project management team should engage in in-depth discussions with the design agency to fully understand the design details; any discrepancies between the design and the actual construction conditions, as well as any implicit issues within the design, must be clarified and resolved promptly ; Regarding some controversial issues, the functions of the client and the supervision engineer should be skillfully utilized to avoid direct conflicts. 6. Coordination of the relationship between the project management team and material suppliers: The project management team and material suppliers should, in accordance with the supply contract, make full use of price bidding, competitive mechanisms, and supply-demand mechanisms to ensure good cooperation. The project management team should, under the guidance of the project management implementation plan, carefully prepare a material requirement plan and conduct thorough investigations on the market, selecting suppliers on the basis of ensuring material quality and supply. To ensure smooth cooperation between the two parties, the project management team should sign a supply contract with the material supplier, striving to make such a contract as specific and clear as possible. To reduce the risks associated with resource procurement and improve resource utilization efficiency, supply contracts should specify matters such as quantity, specifications, quality, timing, and supporting services. The project management department should make effective use of price mechanisms and competition mechanisms to establish reliable supply and demand relationships with material suppliers, ensuring material quality and service delivery. 7. Coordination of the relationship between the project management team and subcontractors: The coordination of the relationship between the project management team and subcontractors shall be carried out in accordance with the subcontract agreement. It is necessary to properly manage technical and economic aspects, as well as ensure proper coordination in areas such as project schedule control, quality control, safety control, cost control, management of production resources, and site management. The project management department should also supervise and support the work of the subcontractors. The project management team should enhance communication with subcontractors, stay informed about their situation on a timely basis, address any issues that arise promptly, and support the contractor’s activities in a relationship based on equality as contractual parties. At the same time, it should strengthen oversight to prevent problems from becoming more complex or widespread. 8. Coordination of the relationship between the project management department and other entities: The coordination between the project management department and relevant entities from other public sector agencies should be carried out through improved planning, as well as through the employer or the project supervisor. The specific requirements include: asking the construction team to obtain a permit for subcontracting teams from the construction administration department, and to get employment certificates for the labor workers from the labor management department ; Handle procedures for obtaining enterprise safety qualification certifications, safety construction permits, project manager safety production qualifications, etc ; Obtain the on-site fire safety qualification certification, and go to the transportation authorities to get a pass ; Go to the local household registration office to complete the procedures for migrant workers’ residence registration ; Go to the local urban management department to handle the approval procedures for temporary construction along the street ; Go to the local **quality supervision and management department to handle procedures such as the construction project quality supervision notice ; Submit to the urban appearance supervision department the plan outlining the measures to ensure no spillage during transportation, no leakage of wastewater, proper disposal of waste, and appropriate conditions of the site, along with the route map ; Cooperate with environmental protection authorities to carry out noise monitoring at the construction site ; When cutting down trees for construction purposes, an application must be submitted for approval by the municipal gardening authorities ; When carrying out large-scale projects or construction in areas with a high concentration of cultural relics, the project manager should contact the municipal cultural relics authorities in advance. Cultural relic surveys or inspections should be conducted in areas where cultural relics might exist within the construction site; if such relics are found, a joint decision should be made regarding how to handle them ; Bring the project approval documents, topographic maps, overall building layout plans, electricity consumption data, etc., to the city’s electricity supply management department to go through the procedures for applying for electricity supply for the construction site ; After the tap water supply plan is approved by the urban planning authorities, application procedures must be carried out with the tap water management department, which will also be responsible for preparing the relevant construction drawings. Meanwhile, documents such as the land use permit, topographic map, general layout plan, foundation layout plan, construction permit, and approval documents for the water supply plan are required. The coordination of the project management team’s relations with external parties should be carried out in strict compliance with the law and public morals, making full use of the capabilities of intermediary organizations and social management agencies. The coordination of distant external relationships should primarily be based on public principles; by ensuring the legitimacy of one’s own actions, such relationships can be handled in a fair and just manner, thereby improving efficiency. In summary, to complete a successful project, in addition to being able to carry out basic responsibilities, a project manager should also possess a range of skills. They should know how to boost employees’ morale and how to gain customers’ trust ; At the same time, they should also possess strong leadership skills, the ability to train others, good communication and interpersonal skills, as well as the capacity to handle and solve problems. Coordination in project management involves many aspects, all of which are quite detailed and intricate. This highlights the importance of coordination among various specialized teams for the successful implementation of a project. Project managers must strengthen management in this area and carry out all tasks properly, so as to address potential problems at an early stage and ensure that the project goals are achieved.
I wonder if LZ is a supervision engineer? Coordination is one of the main tasks within the scope of work for a supervision engineer! Conceptually, coordination means matching appropriately and keeping in step ; It is to eliminate conflicts between objects, ensure they work together properly, and leverage the system’s advantages. In practical work, coordination may be an active and voluntary action by the parties involved, or it may involve negotiation, mediation, arbitration, or good offices by a third party. The purpose of coordination is to reach a consensus, enabling all parties involved in the collaboration to work closely together, in unison, to achieve their goals. Coordination methods include: organizational coordination, information exchange and communication, negotiation, etc. As a supervision engineer, the coordination tasks during the project supervision process mainly include: 1. Resolving conflicts of interest between the owner and the contractor; 2. Resolving conflicts of interest among different contractors; 3. Resolving conflicts between various objectives of the project. The supervision agency should develop corresponding coordination plans to clarify: 1. The procedures for external coordination by the supervision agency; 2. The systematic procedures among all parties involved in the project; 3. The systematic procedures for the work of the supervision agency; 4. Preparing relevant coordination forms to document the progress of coordination efforts. In summary, coordination work does not necessarily require a high level of technical expertise, but it does require strong interpersonal skills and communication abilities ; It is necessary to bring the two parties in conflict or opposition back to the negotiation table to resolve the issue calmly. Wish you success in your work!
The most important task of a project manager is communication: 1. Professionalism – the project manager must be familiar with the business. 2. Carefully examine drawings and documents to avoid being looked down upon due to one’s own mistakes during communication. 3. One must be firm with subcontractors; don’t always agree to their demands. If you are weak, they will be overbearing, but if you are strong, they won’t dare to act recklessly
File management is important: Create multiple folders; under the project there should be a folder for the company itself and another folder for the contractor. Our company’s folders are further divided into various specialties, and so are the construction tasks, such as piping, equipment, painting, welding, schedules, etc. Each time a file is sent, prepare a file list; the file list should be numbered (either arbitrarily or in accordance with the company’s file management regulations)
The person above wrote too much; it’s obvious they copied it from a book. Coordination work depends on the size of the project; it’s very difficult to handle coordination for large projects without proper experience. It also depends on specific circumstances, and it can’t be explained in just a couple of sentences. For small projects, it’s fine to learn while doing them.
In my work at the company, I served as the project manager for the technical renovation project of ×× equipment. The investment in this project is nearly 20 million. There are dozens of entities involved in it, including those responsible for design, main equipment manufacturing, auxiliary equipment manufacturing, custom processing, supply of primary materials, supply of supplementary materials, equipment installation, supervision, testing, and commissioning. With so many parties involved, disputes are likely to arise, and such disputes lead to delays in the project timeline. Therefore, we believe that to manage a project effectively, it is first necessary to establish clear progress goals, and all relevant parties should prepare their own plans to meet these goals, which must then be approved by the project team before implementation. The project team further emphasizes the importance and authority of these progress goals. The project team holds regular engineering meetings, during which the equipment installation unit reports on the progress achieved as well as any issues that arise during the project. These issues are analyzed to identify the responsible parties and determine the causes, after which corrective actions are taken immediately. In project management, it is essential to fully leverage the role of project supervisors; the supervisors are on the front line, with the project team providing support to assist their work. The project team keeps track of the project progress in a timely manner and anticipates potential problems, taking action early to resolve them promptly. The company should grant authority to the project team, and all internal departments should fully cooperate with the team’s work; the achievement of project deadlines is also included in the assessment under the economic responsibility system. The project team also needs to pay attention to working methods, go to the site to understand the situation, and identify and resolve issues promptly. The project manager needs to maintain regular communication with relevant parties, and for certain issues (critical issues), they must take personal action and see them through to the end.
Coordination of various aspects such as people, tasks, finances, and resources involving the project owner, supervisors, suppliers of equipment and materials, subcontractors, migrant workers, local residents and farmers, other construction companies on site, as well as internal elements of the construction team.
During the construction of engineering projects, organization and coordination are extremely important. By organization is meant something that is \"structured and arranged according to certain purposes, tasks, and forms, so as to be systematic or form a whole,\" while coordination refers to negotiation and mediation, meaning \"discussing together in order to reach an agreement\" and \"acting as a mediator between the two parties to facilitate reconciliation.\" It can be seen that the role of organization and coordination is to focus on achieving the various objectives of a project; by relying on contract management, it involves organizing and coordinating all the parties involved in the project, as well as related organizations and departments, to ensure their full cooperation in the project’s implementation. This helps to form an efficient construction team that works together to achieve the project’s goals. Among the basic functions of project supervision, namely \"three controls, two managements, and one coordination,\" the three controls and two management tasks have clear scope of work and specific requirements, whereas coordination runs through all of these elements and is integrated into the control procedures. It can be said that coordination is the lubricant of control, and coordination is the propeller of control. I. Principles of project organization and coordination Work on construction projects involves three main organizational entities: the project owner, the contractor, and the supervisor. The entire construction project takes place within a broader social context, and project organization and coordination encompass both internal coordination among the project owner, contractor, and supervisor, as well as external coordination with various parties such as government departments, financial institutions, social organizations, service providers, the media, and the local community. Project organization and coordination involve the coordination of interpersonal relationships, organizational relationships, supply and demand relationships, cooperation relationships, and regulatory relationships. The coordination of various relationships shall adhere to the following principles: (1) Compliance with the law is the primary principle in organizational and coordination work. Coordination and work must be carried out within the scope permitted by the laws and regulations related to engineering construction in Beijing. For the owner’s project team, it is even more necessary to strictly abide by laws and regulations; only in this way can organizational and coordination tasks be carried out effectively. (II) Organization and coordination must uphold the principle of fairness. It is necessary to take the project’s perspective, handle each dispute fairly, and prioritize the project’s best interests above all else. To carry out effective organization and coordination, it is necessary to safeguard the interests of both parties to the contract in accordance with its provisions. Only in this way can the interests of the owners be properly protected in the end. (III) The principle of consistency between coordination and control objectives. In engineering construction, attention should be paid to the integration of quality, schedule, cost, environment, and safety, with no aspect being neglected. The goals of coordination and control are consistent; coordination cannot be carried out in isolation from the construction objectives. At the same time, the quality, schedule, cost, environment, and safety of the project must all be taken into account, without emphasizing one goal at the expense of others. II. Contents of project organization and coordination work I believe that, in the construction of a project, the main tasks related to organization and coordination include: 1. Coordinating relations with **relevant departments; 2. Organizing and coordinating the work of supervision units, surveying units, and design units; 3. Organizing and coordinating the work of various construction units (including general contractors, specialized contractors, suppliers, etc.); 4. Coordinating and resolving any problems or disputes that arise during the project. (I) Coordination with **relevant departments According to the industry management regulations, laws, and statutes in our country, the various industry authorities **(such as the Development and Reform Commission, Planning Commission, Land Bureau, Parks Bureau, Transportation Bureau, Power Supply Bureau, Telecommunications Bureau, Construction Committee, Fire Department, Civil Air Defense Office, Water Conservation Office, local streets, etc.) all possess different approval or management powers over the implementation of a project. The ability to establish effective organization and coordination with these various industry authorities has a direct impact on the achievement of the project’s objectives. Based on past experience in coordinating work with the **relevant regulatory authorities, I believe the following points should be given priority attention: 1. It is necessary to fully understand and grasp the legal requirements, regulations, and rules set by the **regulatory bodies in various industries, as well as the corresponding procedures for handling matters; appropriate preparations should be made in advance before communicating (such as documents, materials, and questions to be answered), so as to have a clear understanding of what is required. 2. Fully respect the procedures and requirements set by the **industry regulatory authorities; when necessary, communicate in advance first, and under no circumstances should one be defiant or perfunctory. 3. Leverage the respective performance capabilities and strengths of different individuals; different **responsible departments are overseen by dedicated personnel to ensure stable communication channels and effective coordination. (II) Organization and coordination with survey, design, and construction supervision units: The project department shall, based on the actual conditions of the project, develop a contract network diagram for it. This contract network diagram shows the contractual relationships among all the parties involved in the project, specifies the channels for coordination and communication among them, and serves as a basis for formulating the overall project schedule plan, overall cost control plan, and quality management plan. Among them, the overall progress control plan must be thoroughly discussed by the owner, supervisor, designer, and general contractor to reach a consensus, and then issued after being signed off by all parties. The overall cost control plan and quality management plan must be reviewed by the owner, and shall be issued for implementation only after obtaining the owner’s approval. The contract network diagram, overall schedule control plan, overall cost control plan, and quality management plan all serve as the basis for the project department to organize and coordinate work with various participating units. During the design phase, the project department should focus on coordinating the work between the conceptual design unit and the units responsible for the preliminary and detailed design. The key to organizing this coordination lies in establishing a design schedule that covers the tasks of both parties, as well as holding regular meetings to review specific design proposals, thereby ensuring consistency in the design concepts and principles at each stage. Regarding the organization and coordination by the construction contractor, I believe that a general contracting system for construction should be adopted. Through bidding and contractual terms, the scope of work for the general contractor and the subcontractors appointed by the owner should be defined, as well as the management responsibilities and powers of the general contractor over the subcontractors. It is specified that the Jianan general contractor shall bear overall responsibility for the project’s quality, schedule, safety, and environmental protection, thereby giving the contractor both the responsibility and the authority to carry out overall management. For materials and equipment that are purchased directly by the owner, the purchase contract must specify the delivery time, location, and corresponding quality responsibilities. In summary, regarding the organization and coordination of the aforementioned construction and supply units, it is necessary to rely on contract management as a foundation, while also utilizing technical, economic, and legal approaches. This enables all parties, despite their differing interests, to communicate and negotiate in a timely manner with the goal of achieving the overall objectives of the project, thereby resolving any conflicts or issues that arise and helping to form an efficient \"construction team\" among all project participants. For supervision agencies, it is important to establish their authority over on-site management issues, to respect their right to veto decisions regarding construction quality as well as their authority over construction scheduling, in addition to the legitimate rights and interests granted to them by Beijing’s laws and regulations. If issues related to construction quality or progress at the site are identified, it is necessary to communicate and negotiate with the supervisor promptly. It is important to ensure that the supervisor issues corresponding instructions to the construction team. At the same time, the supervisor’s role in overseeing construction quality, schedule, and quantity measurement should be fully utilized; close communication and coordination with the chief supervisor are essential, especially when dealing with major issues at the site, where both parties should strive to reach an agreement in advance. To carry out the above tasks, it is necessary to have a comprehensive understanding of the design details, grasp the owner’s intentions, and be well-informed about project management. It is necessary to understand the scope of tasks assigned to each contracting unit, their scale and difficulty level, the main construction methods used, the equipment employed, as well as the project’s construction schedule. It is necessary to be familiar with each subcontract, to conduct preliminary analysis of potential conflicts among the subcontractors, and to resolve any such conflicts promptly as they arise during work. It is necessary to focus on the key areas of construction as well as the interfaces between different construction units, in order to avoid and reduce various conflicts arising from unclear division of tasks. In addition, it is important to hold engineering regular meetings and various other meetings properly, by preparing in advance, focusing during the meetings, and conducting follow-up checks after them, to ensure the effectiveness of organizational coordination work. (III) Ensure effective information communication management with relevant parties. Experience has shown that conflicts in work often arise due to poor information flow, as various involved units act on their own during the construction process. Therefore, we must establish an effective communication system to ensure that information is properly transmitted throughout the entire project construction process. In particular, it is essential to manage communication effectively with the owners, supervisors, contractors, and designers. Communication management with relevant parties should adhere to the following points: 1. Communication management with the client (1) Requests and reports to the client should generally be made through the project manager, in order to ensure the complete and consistent transmission of information. (2) The project manager shall directly seek instructions and report on work to the owner’s representative. (3) Reports and documents submitted to the owner must be reviewed and approved by the project department manager and stamped with the project department’s official seal before they can be issued; for such documents, there should be dedicated receipt records for filing, along with signatures from the relevant personnel. (4) The owner’s instructions and documents issued to the project department should be filed separately. (5) Prepare monthly and weekly work plans to guide daily operations, and have the information engineers submit monthly reports to the owner on schedule. (6) Collect owners’ feedback in a timely manner; any complaints or dissatisfaction from owners should be reported promptly to the supervising managers and the general manager, so that appropriate actions can be taken. (7) Conduct irregular communications with the owner’s management to promptly coordinate and resolve relevant issues. 2. Communication and management with the supervision and construction units: (1) Communication with the supervision and construction units is generally carried out through meetings, written documents, and oral discussions, in accordance with the principle of matching experts to their respective roles. (2) Issues related to the on-site quality and progress of the construction unit should generally be handled by the supervision unit; if necessary, a special meeting attended by the supervision unit and the construction unit can be organized. (3) Attend on time the supervision briefing meetings and regular project meetings organized by the chief supervision engineer with all relevant parties, and at the construction site, it is necessary to respect the authority and dignity of the supervision engineer. (4) Instructions and arrangements for the construction unit should generally be issued and arranged by the supervision unit. (5) Urge the supervision unit to submit relevant monthly supervision reports, supervision notices in a timely manner, as well as to approve the documents submitted by the construction unit. (6) The project manager should strengthen communication and coordination with the chief supervision engineer and the general contractor manager, especially regarding the handling and decision-making of major issues. (7) The management of on-site quality and progress by subcontractors should generally be carried out through the general contractor. (8) The project department should pay attention to collecting feedback from the supervision and construction units. (9) All documents received and sent to various parties should be filed and kept separately. 3. Communication management with the design unit should include the following: (1) The project manager shall take charge of communicating and coordinating with the design unit. (2) The management information for documents such as design drawings shall be uniformly registered and stored by information engineers, and requisition procedures shall be followed when using them. (2) The project department shall promptly organize the design unit to attend design briefings, regular project meetings, and other specialized meetings. (3) The professional engineers in the project department are responsible for coordinating and communicating with the design team leaders to confirm design changes and negotiations. (4) The project manager should pay attention to communication and coordination with the chief designer. (5) Any work plan related to the design unit shall be copied and submitted to the design unit. (6) Documents sent and received with the design unit should be filed separately.