HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Should the nitrogen replacement pipeline for the LNG tank be placed at the top or bottom of the tank?

2009-03-06View Original

Thread Content

Is it more reasonable to place the nitrogen replacement pipeline for LNG tanks at the top or the bottom of the tank?
Reply #22009-03-06
Enter from the top and go all the way to the bottom, including the bottom of the annular space and the bottom of the inner tank floor
Reply #32009-03-07
The bottom part is fairly reasonable. Insert from the top (near the inner tank wall) until to the center of the bottom of the inner tank.
Reply #42009-06-30
Nitrogen purging is primarily used for purging and drying before LNG feeding, while the LNG outlets are located at the top of the tank. To achieve effective purging, they should be placed at the bottom of the inner tank; the circumferential space as well as the insulation layers above and below the tank bottom can also be led from the inner tank.
Reply #52014-09-05
Since air is heavier than nitrogen, air should enter from the top and exit from the bottom

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.