HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Daily Question 20090309] The air volume adjustment in boiler combustion adjustment is generally used ().

2009-03-08View Original

Thread Content

[Daily question 20090309] 1. The air volume adjustment in boiler combustion adjustment generally uses (). A. Uniform adjustment system; B. Ratio adjustment system ; C. Feedforward regulation system ; D. Three-impulse adjustment system 2, () works in scanning mode. A. Programmable controller ; B. Industrial computer ; C. Ordinary PC ; D. Microcontroller 3, regarding the adjustment system block diagram, the correct statement is () A. One block represents a device ; B. The connection between the blocks represents the material relationship between the blocks. ; c. The lines connecting the blocks represent the energy relationship between the blocks. ; D. The connections between the squares only represent the signal relationship. Standard answer: 1B 2A 3B This post was last edited by wopale3 on 2009-3-15 14:00 ]
Reply #22009-03-08
1. The air volume adjustment in boiler combustion adjustment is generally selected (B). A. Uniform adjustment system; B. Ratio adjustment system ; C. Feedforward regulation system ; D. Three-impulse adjustment system 2, (A) works in scanning mode. A. Programmable controller ; B. Industrial computer ; C. Ordinary PC ; D. Microcontroller 3, regarding the adjustment system block diagram, the correct statement is (B) A. One block represents a device ; B. The connection between the blocks represents the material relationship between the blocks. ; c. The lines connecting the blocks represent the energy relationship between the blocks. ; D. The connections between the squares only represent signal relationships
Reply #32009-03-08
1.B 2.A 3.B
Reply #42009-03-09
1.B; 2.A;3.B
Reply #52009-03-09
1. The air volume adjustment in boiler combustion adjustment is generally selected (B). A. Uniform adjustment system; B. Ratio adjustment system ; C. Feedforward regulation system ; D. Three-impulse adjustment system 2, (A) works in scanning mode. A. Programmable controller ; B. Industrial computer ; C. Ordinary PC ; D. Microcontroller 3, regarding the adjustment system block diagram, the correct statement is (D) A. One block represents a device ; B. The connection between the blocks represents the material relationship between the blocks. ; c. The lines connecting the blocks represent the energy relationship between the blocks. ; D. The connections between the squares only represent signal relationships. This post was last edited by qiuqiuwenzi on 2009-3-9 07:55 ]
Reply #62009-03-09
1. The air volume adjustment in boiler combustion adjustment is generally selected (B). A. Uniform adjustment system; B. Ratio adjustment system ; C. Feedforward regulation system ; D. Three-impulse adjustment system 2, (A) works in scanning mode. A. Programmable controller ; B. Industrial computer ; C. Ordinary PC ; D. Microcontroller 3, regarding the adjustment system block diagram, the correct statement is (B) A. One block represents a device ; B. The connection between the blocks represents the material relationship between the blocks. ; c. The lines connecting the blocks represent the energy relationship between the blocks. ; D. The connections between the squares only represent signal relationships
Reply #72009-03-09
My answer is also BAB
Reply #82009-03-09
1.B 2.A 3.B
Reply #92009-03-09
1. The air volume adjustment in boiler combustion adjustment is generally selected (D). A. Uniform adjustment system; B. Ratio adjustment system ; C. Feedforward regulation system ; D. Three-impulse adjustment system 2, (B) works in scanning mode. A. Programmable controller ; B. Industrial computer ; C. Ordinary PC ; D. Microcontroller 3, regarding the adjustment system block diagram, the correct statement is (D) A. One block represents a device ; B. The connection between the blocks represents the material relationship between the blocks. ; c. The lines connecting the blocks represent the energy relationship between the blocks. ; D. The connections between the squares only represent signal relationships
Reply #102009-03-09
My answer is 1.B 2.A 3.B
Reply #112009-03-09
My answer is: B,A,B
Reply #122009-03-09
I think it should be 1.B; 2.A ; 3 ; D.
Reply #132009-03-09
my answer: 1.B 2.A 3.B
Reply #142009-03-09
1.B; 2.A;3.B
Reply #152009-03-09
1.B 2.A 3.B
Reply #162009-03-09
1.D 2.A 3.B
Reply #172009-03-09
1.B 2.A 3.B
Reply #182009-03-09
1.B 2.A 3.B
Reply #192009-03-09
1. The air volume adjustment in boiler combustion adjustment is generally selected (B). A. Uniform adjustment system; B. Ratio adjustment system ; C. Feedforward regulation system ; D. Three-impulse adjustment system 2, (A) works in scanning mode. A. Programmable controller ; B. Industrial computer ; C. Ordinary PC ; D. Microcontroller 3, regarding the adjustment system block diagram, the correct statement is (B) A. One block represents a device ; B. The connection between the blocks represents the material relationship between the blocks. ; c. The lines connecting the blocks represent the energy relationship between the blocks. ; D. The connections between the squares only represent signal relationships

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.