Is it necessary to specify the equipment flushing weight in the preliminary civil engineering conditions?

2009-03-10View Original

Thread Content

As the title suggests: Is it necessary to specify the equipment flushing weight in the preliminary civil engineering requirements? This post was last edited by hutom123 on 2009-3-24 16:23]
Reply #22009-03-10
The weight of the water filled into the equipment must be specified in the preliminary civil engineering conditions. Because if the density of the working medium is close to that of water or lighter than water, the equipment is under the greatest load during water pressure testing; therefore, the civil engineering team must take this factor into account when constructing the equipment foundations.
Reply #32009-03-10
The flushing weight of the equipment must be specified. If the density of the medium is greater than that of water, then the weight of the medium must also be provided.
Reply #42013-08-10
Both the operation cost and the hydrostatic test cost need to be included.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.