HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Electronic version of \"Technical Standards for Inspection of Aluminum Smelting Equipment – Electrolysis Section\"

2009-03-10View Original

Thread Content

【Dimensions】 26cm 【ReadXiu ID】 000005995667 【Publication details】 Gansu Nationalities Publishing House, 2006 【ISBN】 7-5421-1073-X / TF821-65 【Keywords】 Aluminum smelting (Subject: Smelting equipment; Subject: Equipment management; Subject: Standards); Aluminum smelting (Subject: Electrolysis; Subject: Equipment management; Subject: Standards) 【Reference format】 Edited by Wan Yaping, with contributions from Wang Xuan et al. Technical Standards for Inspection of Aluminum Smelting Equipment – Electrolysis Section. Gansu Nationalities Publishing House, 2006.
Reply #22009-03-10
Take a look to see if this works – it has no cover, but the image is clear! http://bbs.hcbbs.com/thread-411720-1-1.html
Reply #32009-03-17
Are there any inspection procedures for anode production equipment? I work in this industry

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.