HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Are there bidding documents for engineering design?

2009-03-12View Original

Thread Content

The company wants to build a new factory and is selecting a design firm. We need to prepare a bidding document now; it’s our first time dealing with this, so we don’t know where to start. If any of you have a template, I would be extremely grateful!
Reply #22009-03-13
I am not yet able to upload the documents, but generally the following information is required: 1. Project name; 2. Location of the project; 3. Project timeline; 4. Scope of the project; 5. Technical requirements; 6. Brief description of the production process; 7. Technical specifications and requirements; 8. Explanation of the quotation; 9. Other details; 10. Warranty period
Reply #32009-03-13
Firstly, the tender documents should be prepared based on the characteristics of the tendered project. Typical tender documents should include: 1. The technical requirements for the tendered project (i.e., the project design); 2. The criteria for evaluating the qualifications of bidders (design firms); 3. Requirements regarding bid prices; 4. Substantive requirements and conditions such as the evaluation criteria; 5. The main terms of the contract to be signed. For reference only!
Reply #42009-03-25
What device? I can help, but I need some details first; please send a brief description to yinpinzhinan@126.com and I’ll get back to you.
Reply #52009-03-25
I can provide information on anti-corrosion projects
Reply #62009-03-25
Take a look at what type of design firm is needed, what qualifications and design experience are required. I do have a few samples, but I’m not sure if they’ll work. Let me know if you need them
Reply #72009-03-25
:) :) :) OP, you need to specify which type is required.
Reply #82009-03-26
Some are designed as trade secrets and cannot be provided.
Reply #92009-03-27
**Company’s **Project Design Bidding Document (Internal Bidding Document)
I. Project Name:
II. Bidding Entity:
III. Scope of the Bidding Project:
IV. General Requirements:
1. Basic requirements for bidders:
1.1 Qualification requirements: Bidders must possess the capability to carry out the design work for this project, have advanced, mature, and reliable **** project design solutions, and have a sufficient number of designers and experts with the appropriate design qualifications and expertise. 1.2 Bidders must possess Class A qualification for professional design related to this project, as well as a complete design quality assurance system and a solid track record of successful projects. 1.3 It has independent legal person status, sound financial conditions, and a good track record of fulfilling contracts. 1.4 The design services provided by the bidder, as well as the design itself and any of its components, shall be free from any claims by third parties regarding infringement of patent rights, trademark rights, or industrial design rights. Should any such claim be made, the designer shall negotiate with the third party and bear all possible legal responsibilities and costs. 1.5 The bidder must provide the project owner with technical guidance for construction, installation, and commissioning, offer all high-quality services related to this, and take responsibility for the products designed. It must ensure that there are no adverse effects on quality, safety, construction progress, or operational efficiency after the products are put into use due to reasons related to the design. In the event that any such adverse effects occur as a result of design flaws, the designer shall bear all relevant responsibilities. 2. The design must comply with ** and relevant industry standards (design, construction, and acceptance shall adhere to the provisions of the following standards). 3. The products designed, as well as their various components, supporting facilities, and anti-corrosion measures, must meet or exceed the performance and lifespan standards of similar products and their components, supporting facilities, and anti-corrosion measures. They must be suitable for use under the manufacturer’s production conditions, allow for easy operation and control, and have a design lifespan of over 20 years. 4. Save costs for the developer. 5. Provide the constructor with 5 complete sets of documents (including a full set of general layout plans, equipment overview diagrams, component diagrams, assembly diagrams, component assembly diagrams, all part drawings, piping construction drawings, process flow diagrams with control points, electrical control construction and schematic diagrams, instrument control construction and schematic diagrams, operating procedures, design calculations and specifications, user manuals, etc., as well as other drawings and technical materials required as specified). . . . . . . ). V. Requirements for technical and economic indicators: VI. Scope of design: VII. Information on the working environment: **City-owned*** zone, semi-humid climate in spring and summer, mild climate, abundant rainfall; average annual temperature is **℃**, average temperature in the coldest month of January is **℃**, average temperature in the hottest month of July is **℃**, with an annual rainfall of *** millimeters. The average annual wind speed is ** meters per second; the prevailing wind direction throughout the year is from the north, and the average annual relative humidity is **%. 1. Average annual air temperature:**℃ ; 2. Minimum temperature in winter:**℃ ; 3. Maximum summer temperature:**℃ ; 4. Topographical characteristics of the construction site: VI. Application requirements: 1. Qualification requirements: Bidders must have the capability to carry out the design work for this project, possess advanced, mature, and reliable ****** design solutions as well as relevant design experience, and have a sufficient number of designers and experts with the appropriate design qualifications and skills. 2. Bidders must possess first-class qualifications in the relevant professional design for this project, as well as a complete design quality assurance system and a solid track record of successful projects. Relevant qualifications and valid proof of performance must be provided. 1.3 It has independent legal person status, sound financial conditions, and a good track record of fulfilling contracts. 3. It has independent legal person status, sound financial conditions, and a good track record of fulfilling contracts. VII. Preparation of the bid document 1. Company profile and brief overview of previously planned projects (it is necessary to provide evidence of successful implementation of **** projects for which independent intellectual property rights exist). 2. Services that the bidder can provide and the charging standards. 3. Design plan. 4. Financial statements for the previous year. VIII. Schedule for bidding registration: IX. Contact person: Phone number: Fax: Email: *******Co., Ltd. ***** year ***** month ***** day This post was last edited by ddfmy on 2009-3-27 04:44]
Reply #102009-03-27
Please refer to the standard text: Construction Project Design Contract.
Construction Party (Party A): ____________________________ Address: ____________ Postal Code: ____________ Phone Number: ____________ Legal Representative: ____________ Position: ____________
Design Party (Party B): ____________________________ Address: ____________ Postal Code: ____________ Phone Number: ____________ Legal Representative: ____________ Position: ____________
In order to clarify responsibilities, coordinate efforts, and jointly complete the design tasks for the construction project, and in accordance with the plan approved by ________, this contract is hereby signed through full consultation between Party A and Party B for mutual compliance. Article 1: Party A entrusts Party B to undertake the design work for the ____________ project, with a construction and installation area of ________ square meters. The approved total investment amount is ________ ten thousand yuan, and the construction site is located in ________. Article 2 Obligations of Party A 1. Party A shall, by __________ year __ month __ day, submit to Party B the design assignment approved by higher authorities, the site selection report, as well as agreement documents regarding raw materials (or approved resource reports), fuel, water, electricity, transportation, etc.; survey data that meet the requirements for preliminary design; and technical data obtained through scientific research. Prior to the preparation of the construction drawings on ____ year ____ month ____ day, Party A shall provide the approved preliminary design documents, survey data that meet the requirements for construction drawing design, the conditions necessary for construction, as well as technical information related to the equipment. Party A must ensure the quality of the aforementioned materials and shall not make arbitrary changes to them. 2. Promptly handle the approval of design documents at each design stage. 3. Before the start of the project, Party A shall organize the relevant construction units, with Party B responsible for providing design technical explanations ; Upon completion of the project, Party A shall notify Party B to attend the completion inspection. 4. When designers go to the construction site to carry out their work, Party A shall provide the necessary working conditions and facilitate their daily lives. Any costs associated with trial production tests that are required due to technical necessities during the design and construction process, as well as the travel expenses related to accompanying Party A to other locations, shall be borne by Party A. 5. Party A must safeguard Party B’s design documents and shall not modify them without permission. Without Party B’s consent, Party A shall not copy, reuse them, or expand the scope of construction on its own. Party A is obligated to protect Party B’s design copyrights and shall not transfer them to third parties for reuse. Article 3 Obligations of Party B 1. Party B must deliver the preliminary design documents to Party A by ________ year, ____ month, ____ day ; Deliver the technical design documents to Party A by ________ year, ____ month, ____ day ; Submit the construction drawing design documents to Party A by ________ year, ____ month, ____ day. Among them, there are ____ copies of the preliminary design documents, __ copies of the technical design documents, and ____ copies of the construction drawing documents. If the client requires an additional number of copies or models, extra fees will apply. ________By __/__/__, Party B must submit all design documents to Party A (including the budget estimate and a list of materials and equipment). (For large-scale building installation projects, the two parties may carry out the design in phases depending on the specific circumstances. Once the conditions for design are met, the two parties shall sign a phase-based design contract, which shall specify the names and dates by which the party A must submit the design documents, as well as the date by which party B shall deliver the design files. These details are provided in Appendix (2).) 2. Party B must, in accordance with the approved design assignment or the approval documents for the previous phase of design, as well as relevant design technical agreement documents, design standards, technical specifications, regulations, and quotas, establish technical requirements for surveying and carry out the design, submitting design documents that meet quality standards. 3. After the preliminary design is reviewed by the superior competent authority, Party B shall be responsible for making any necessary modifications within the scope of the original task statement. 4. The design unit shall cooperate with the construction of the construction project for which it is responsible, provide technical instructions prior to construction, address any design-related issues that arise during construction, be responsible for design changes and budget revisions, and participate in the inspection of concealed works as well as the final acceptance of the project. Article 4 Modifications and Cessation of Design 1. If Party A requests modifications to the design of the project for certain reasons, and with Party B’s consent, except that the delivery date of the design documents will be determined separately, Party A shall pay an additional design fee of ________ yuan per working day spent on the revisions (or calculated as a percentage of the workload involved in the revisions at that particular design stage). 2. In the event that significant changes are made to the original task order, resulting in the need to redesign or modify the design, a letter of opinion from the design approval authority or the authority that approved the task order is required; after consultation between the two parties, a new contract shall be established. The payment for design fees that have already been incurred is calculated in accordance with the method specified in the previous clause. 3. If Party A requests to terminate the design work midway for any reason, it shall notify Party B in writing without delay. The design fees already paid will not be refunded; instead, an additional fee will be calculated based on the actual number of working days spent on that phase, and the fee for that phase will be settled, thereby terminating the contract relationship. Article 5: Amount and Payment Method of Design Fees Within ____ days after the entry into force of this design contract, Party A shall pay Party B a deposit equal to 20% of the design fees; upon completion of the design contract, this deposit shall be applied as part of the payment for the design fees ; Within ____ days after Party B submits the preliminary design plan to Party A, Party A shall pay Party B ____% of the design fee ; Within ____ days after Party B submits the construction drawings to Party A, Party A shall settle the full amount of design fees to Party B (for large-scale projects with a long design period, the design fees for the construction drawings stage may be paid separately upon the completion of each individual design task). Article 6 Rewards and Liability for Breach of Contract 1. Within the reasonable limits of project investment control, if Party B saves on project costs by employing advanced technologies or sound recommendations, ____% of the amount saved shall be awarded to Party B as a reward. 2. Since Party A fails to provide the relevant design materials on time and accurately, resulting in Party B’s inability to carry out the design work or the need for design revisions, Party B may not only postpone the delivery date of the design documents but also require Party A to pay an additional design fee equal to ________ yuan per day, based on the actual number of working days lost by Party B. 3. If Party A fails to pay the deposit and design fees to Party B within the time specified in the contract, it shall pay Party B liquidated damages in accordance with the bank’s regulations regarding delayed payments. 4. If the delivery of the design documents is delayed due to Party B’s reasons, for each day of delay, Party B shall pay Party A a penalty equal to ____% of the design fee (which Party A may deduct from the design fee). 5. If rework is required due to the poor quality of the design provided by Party B, Party B shall continue to improve the design, and the design fee may be reduced or waived depending on the extent of the resulting losses and waste. In the event of a major quality accident in the project caused by Party B’s design errors, Party B shall not only waive the design fees related to the affected areas but also pay compensation equal to the design fees for those areas that were directly impacted. Article 7 Other agreements _____________________________________________________________ This contract shall come into force on ________ year __ month __ day upon the signing by both parties, and it shall become invalid once all design tasks have been completed. Should there be any matters not covered in this agreement, supplementary provisions shall be established through mutual consultation between the two parties. The supplementary agreement shall have the same validity as this contract, but shall not conflict with the contents of this contract. In the event of disputes during the execution of the contract, both parties shall resolve them through timely consultation. If no agreement can be reached, and the two parties are in the same department, mediation shall be carried out by the higher-level supervising authority ; If mediation fails, one may choose: (1) to apply to an arbitration institution for arbitration, or (2) to file a lawsuit directly with the people’s court. This contract is made in two original copies, with each party, Party A and Party B, holding one copy ; There are ____ copies of the contract, one copy of which shall be retained by each of the units such as ____, ____, ____...   Construction unit (Party A): __________________________ Representative: __________________________ ____ year __ month __ day Design unit (Party B): __________________________ Representative: __________________________ ____ year __ month __ day Last edited by huqingyu on 2009-3-27 14:08 ]

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.