HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Blueprint stamping location

2009-03-12View Original

Thread Content

Dear sea friends, how do you usually stamp blueprints when getting them approved? 1. Should a stamp be placed on each diagram, along with its description and tables? 2. Are there any specific location requirements? 3. Is any of the above specified in any standard?
Reply #22009-03-12
We stamp the design seal on the cover of the general layout and strength calculation documents. During design, leave a space near the title bar on the overall layout for stamping.
Reply #32009-03-13
Don’t the other drawings need to be stamped? What about the material list description?
Reply #42009-03-14
Generally, the design stamp is placed on the overall layout diagram, either in the lower left corner of the details table, or in the blank space above the end of the two rows of details

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.