HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Installation of supports and hangers

2009-03-12View Original

Thread Content

The pipes of the tower descend from a high position, change direction horizontally at a certain level before continuing downward – can fixed load-bearing supports be installed at this point?
Reply #22009-03-12
It depends on the diameter of your pipe, what medium is inside it, and its coefficient of thermal expansion. . . .
Reply #32009-03-12
If the pipeline descends a great distance from the tower, this is usually the case; if it’s not very long, then one needs to consider what was mentioned on the second floor

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.