Dear sea friends: Hello everyone! In February, with everyone's support, the environmental protection zone has significantly improved both the quality and quantity of posts! However, due to my limited ability, during the "Daily Question" activity in the environmental protection zone, the theme of the activity was always multiple-choice questions, with single content and too rigid content, which caused a lot of controversy in the forum! But I firmly believe that if you sow melons, you will reap melons, and if you sow beans, you will reap beans! With the enthusiastic support of all friends, the environmental protection zone will surely flourish! As the saying goes, a three-day break is better than a wedding! The "Daily Question" activity in the Environmental Protection Zone has been launched again after four days! We sincerely hope that everyone can actively participate in the activities and at the same time abide by the "Daily Question" activity plan (revised in 20090312) http://bbs.hcbbs.com/thread-383197-1-1.html Related rules to further improve the quality of postings. In addition, the environmental protection zone carries out the "One Belt One" activity (long-term implementation) http://bbs.hcbbs.com/thread-409617-1-1.html , and everyone is invited to participate at the same time! [Daily Question 20090313] Regarding flue gas desulfurization requirements: Answer choices must provide a basis for your choice. In principle, responses that only contain answers will not be graded. 1. Measures that can effectively reduce the noise of industrial boiler flue gas desulfurization devices include ( ) A. Earplugs B. Sound insulation C. Silencing D. Greening 2. On the premise of meeting emission standards and total volume control requirements for industrial boiler flue gas desulfurization devices below 65t/h, the design desulfurization efficiency should not be less than ( )%. A, 80 B, 85 C, 90 D, 95 3 When the flue gas temperature before entering the desulfurization tower exceeds ( )°C, a necessary flue gas cooling system should be installed. A, 130 B, 140 C, 150 D, 160 4. After the thermal debugging of the industrial boiler flue gas desulfurization device, ( ) hours of continuous trial operation acceptance test should be carried out. A. 24 B. 32 C. 64 D. 72 5. The operating unit of the industrial boiler flue gas desulfurization device ( ) shall establish an environmental protection management agency. A. Must B. Should C. Appropriate This post was last edited by lyhh9024 on 2009-3-13 08:30 ]
1. ABCD (GBJ87 Noise Control Design Code for Industrial Enterprises) 2. C 3. D 4. A Based on the technical regulations for industrial flue gas desulfurization design: lol
According to the "Environmental Protection Industry Standards of the People's Republic of China" 1, BCD 2, C 3, B 4, D 5, B This post was last edited by sky28205065 on 2009-3-13 09:02 ]
1. BCD (GBJ87 Industrial Enterprise Noise Control Design Code) 2. C 3, D 4, A
1. Measures that can effectively reduce the noise of industrial boiler flue gas desulfurization devices include (c) A. Earplugs B. Sound insulation C. Silencing D. Greening 2. On the premise of meeting emission standards and total volume control requirements for industrial boiler flue gas desulfurization devices below 65t/h, the design desulfurization efficiency should not be less than (d)%. A, 80 B, 85 C, 90 D, 95 3 When the flue gas temperature before entering the desulfurization tower exceeds (b) ℃, a necessary flue gas cooling system should be installed. A, 130 B, 140 C, 150 D, 160 4. After the thermal debugging of the industrial boiler flue gas desulfurization device, a (d) hour continuous trial operation acceptance test should be carried out. A, 24 B, 32 C, 64 D, 72 5. The operating unit of the industrial boiler flue gas desulfurization device (b) establishes an environmental protection management agency. A. must B. should C. should
1. Measures that can effectively reduce the noise of industrial boiler flue gas desulfurization devices include (BCD) A. Earplugs B. Sound insulation C. Silencing D. Greening 2. On the premise of meeting emission standards and total volume control requirements for industrial boiler flue gas desulfurization devices below 65t/h, the design desulfurization efficiency should not be less than (B)%. A, 80 B, 85 C, 90 D, 95 3 When the flue gas temperature before entering the desulfurization tower exceeds (B) ℃, a necessary flue gas cooling system should be installed. A, 130 B, 140 C, 150 D, 160 4. After the thermal debugging of the industrial boiler flue gas desulfurization device, (C) hours of continuous trial operation acceptance test should be carried out. A. 24 B. 32 C. 64 D. 72 5. The operating unit of the industrial boiler flue gas desulfurization device (A) establishes an environmental protection management agency. A. must B. should C. should
1. BCD (GBJ87 Industrial Enterprise Noise Control Design Code) 2. C 3, B 4, D 5, B This post was last edited by denty11111111 on 2009-3-13 09:41 ]
1.BCD 2.A 3.C 4.D 5.B All answers are consulted from the Technical Specifications for Wet Flue Gas Desulfurization Engineering for Industrial Boilers and Kilns.
1. BCD 2. C 3. B 4. D 5. B
According to the "Environmental Protection Industry Standards of the People's Republic of China" 1, BCD 2, C 3, B 4, D 5, B
1. Measures that can effectively reduce the noise of industrial boiler flue gas desulfurization devices include (ABCD). 2. For industrial boiler flue gas desulfurization devices below 65t/h, on the premise of meeting emission standards and total volume control requirements, the design desulfurization efficiency should not be less than (C)%. 3. When the temperature of the flue gas before entering the desulfurization tower exceeds (B)°C, a necessary flue gas cooling system should be installed. 4. After the thermal debugging of the industrial boiler flue gas desulfurization device, (A) hour continuous trial operation acceptance test should be carried out. 5. The operating unit of the industrial boiler flue gas desulfurization device (B) shall establish an environmental protection management agency. 2, 3, 4, and 5 are based on the "Environmental Protection Industry Standards of the People's Republic of China" and "Industrial Boiler/Kiln Wet Flue Gas Desulfurization Engineering Technical Specifications" This post was last edited by szzhaojihan on 2009-3-13 14:39 ]
1. BCD 2. C 3. B 4. D 5. B
1.BCD 2.A 3.C 4.D 5.B After checking the "Environmental Protection Industry Standards of the People's Republic of China", the above answer was obtained. This post was last edited by zgd1237 on 2009-3-13 09:51 ]
my answer: 1. BCD is based on the technical specifications for industrial boiler/kiln wet flue gas desulfurization engineering 2. C 3, B 4, D 5, B
1.BCD 2.A 3.C 4.D 5.B According to the technical specifications for industrial boiler and kiln wet flue gas desulfurization engineering, this post was last written by raoben * n edited on 2009-3-13 09:51 ]