Does anyone have information on the detailed rules for managing project documentation?

2009-03-13View Original

Thread Content

Does anyone have information on the detailed rules for managing project documentation? It could be organized by phase (feasibility study, preliminary design, construction drawings, design, procurement, construction, commissioning and completion) as well as by specialty (process systems, piping, civil engineering, utility systems, etc.). Thank you!
Reply #22009-03-13
Please go to the non-standard documents section; it contains the \"Document Control Management Procedure\" for a certain Daxing EPC project that I have posted there
Reply #32009-03-13
I couldn’t find the place you mentioned. Where is the non-standard data area? Please help with a direct link. Points will be given if it’s correct

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.