HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What issues should be paid attention to when hoisting tower equipment?

2009-03-14View Original

Thread Content

43 meters and about 30 tons. The design plan is to use three cranes. Let’s discuss what issues need to be paid attention to during the hoisting process? This post was last edited by lxzzl on 2009-3-30 09:27 ]
Reply #22009-03-14
personal opinion: The weight is not large, but it is relatively long. The main consideration is the deformation of the tower during hoisting and possible contact with surrounding objects.
Reply #32009-03-14
http://bbs.hcbbs.com/viewthread.php?tid=319888&highlight=%CB%FE%C9%E8%B1%B8%B5%F5%D7%B0 Similar posts
Reply #42009-03-14
The coordination and command of the three cranes is the most critical. Is there two main cranes and one lifter? Also pay attention to the influence of wind. It is best to have a tray and rollers at the bottom.
Reply #52009-03-15
Is there such a tall monolithic tower? For the convenience of production and installation, they are generally divided into sections!
Reply #62009-03-16
It is an integral tower, a vaporization tower, and there are guardrails and other labor protection on the tower.
Reply #72009-03-19
It is recommended to use a hydraulic mast for hoisting, which is convenient and economical. The height is not the main problem and can be adjusted through the mast.
Reply #82009-03-20
43 meters, about 30 tons, the design plan is to use three cranes, two cranes are used to lift the main crane, one crane is used to straighten the tail, one main crane is used to lift the top, and one is used to lift the waist shaft lugs. Lifting should be slow and steady, and attention should be paid to clearing away irrelevant personnel and equipment around, setting up a safety cordon, and the entire hoisting process to be under the unified command of a general commander.
Reply #92009-03-30
This tower is not too heavy, but it requires three cranes. A 300-ton truck crane with a 56-meter pole can lift 31.5 tons, a 100-ton truck crane protects the tower waist, and a small shunting crane to slide the tail. The key is not to let the tower bend. This is the key.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.