Let’s discuss to what temperature the feed gas cooler should be pre-cooled during the start-up of the methanol wash unit

2009-03-14View Original

Thread Content

If the methanol scrubbing for nitrogen removal is started half an hour in advance of driving the plant, then what temperature should the raw gas pre-cooler reach in order to be considered satisfactory when using this nitrogen-rich gas for pre-cooling the raw gas? Are there any standards? Should it be based on the temperature of the exhaust gas-to-feed gas cooler? Thank you all! ! (Linde process) This post was last edited by andysky66 on 2009-3-15 22:18]
Reply #22009-03-14
We use the Luchi process, where the process gas exchanges heat with the gas exiting the low-methane column before entering the tower. There is also an ammonia cooler, and the temperature of the process gas exiting this cooler is only eight degrees. When introducing the process gas, the flow rate is 10,000 standard cubic feet per hour, and the temperature of the gas entering the tower at the beginning of this process must not exceed 8 degrees.
Reply #32009-03-14
Methanol scrubbing for nitrogen removal is activated half an hour in advance before driving the process, solely to shorten the gas guiding time, produce qualified process gas as quickly as possible, and reduce waste. As for what temperature it should be cooled to, there’s probably no standard? As long as the process gas obtained through conversion is of satisfactory quality, the pilot gas should also be fine. It’s just that more water will flow into the absorption tower. If the transformation process is already qualified, will no gas be introduced in the absence of N2? It should still be gas-guided; in this case, qualified process gas can still be produced, although there is greater heat loss, a higher content of acidic gases and CO2, and a higher load on the reboiler of the thermal regeneration tower. This post was last edited by cuikk on 2009-3-14 16:45]
Reply #42009-03-14
I completely agree with the opinion above; introducing nitrogen for stripping in advance is mainly aimed at pre-cooling the raw gas heat exchanger, so as to prevent high temperatures from the shift gas from causing an elevated water content in the system. There is no specific target for the degree of pre-cooling required!
Reply #52009-03-15
The ammonia-cooled refrigeration system reaches -20 degrees, while the propylene one reaches -30 degrees

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.