How do you allocate the UGR for gas generation time?

2009-03-14View Original

Thread Content

How do you allocate the gas production time? This post was last edited by ZQLIUGE on 2009-3-14 21:03.]
Reply #22009-03-14
I’ve seen total cycle times of 120, 136, and 150; the current total cycle time is 150. The blowing time is 33–38 seconds, with 32 seconds for upper blowing and 68 seconds for lower blowing. The upper blowing for the second time takes 8–10 seconds, and the drying time without blowing is 3 seconds. I’m referring to the left and right sides; due to changes in weather temperature, steam pressure, and other external factors, the process remains unstable
Reply #32009-03-14
Mine is 120 seconds: blow-dry at 23, upper blast at 35, lower blast at 52, two upper blasts at 5, and finish drying at 5

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.