HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Pressure swing adsorption decarburization

2009-03-15View Original

Thread Content

What are the reasons for the increase in carbon dioxide levels during pressure swing adsorption for its removal? How should one judge? How to handle it?
Reply #22009-03-15
If the adsorption time is too long, the CO2 level increases; solution: reduce the adsorption time. Contact the transformation team to reduce the parameters. If the system is not thoroughly purged during the initial installation of the equipment, it can cause the solenoid valves to stick, leading to air leakage. A low oil pressure in the system can also cause the solenoid valves to stick. This post was last edited by cnypml on 2009-3-15 at 12:39
Reply #32009-03-16
From the perspective of decarbonization alone, the issues may lie in an excessively long adsorption time, incomplete air release, or severe cross-ventilation between various programmable valves. I’m not sure what type of system your company uses – how many adsorption stages does it have, and how many pressure equalization stages? Such problems mainly occur during the pressure equalization process. Generally speaking, it is also possible that the CO2 content in the gas resulting from the transformation is too high; such a situation should be controlled from the stage of gas production
Reply #42009-03-16
Reason, Solution: Excessive increase in dosage or operation beyond capacity – Contact the control system to reduce the rate of dosage increase. Too low suction pressure – Increase the pressure. Excessively long cycle time – Shorten the cycle duration. Excessive amount of fluid displaced – Reduce the amount of fluid displaced. Poor vacuum effect – Check the vacuum pump and contact a technician for repairs. Programmable valve not operating as intended – Address the issue promptly; if that’s not possible, reduce the dosage or stop the operation. Last edited by snowdfr on 2009-3-16 12:29

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.