Regarding the issue of steam venting in the remaining boiler

2009-03-15View Original

Thread Content

The operating procedures require that during the heating stage of the sulfur furnace, the remaining steam in the boiler is vented from the top. When the amount of steam is large, the muffler should be vented. Imagine if it is possible to vent the air without opening the top, without going to the muffler, and directly suppress the pressure to 1.0MPa and send it to the pipe network. Is this okay? This post was last edited by Ma Hai on 2009-3-16 23:24 ]
Reply #22009-03-15
Steam venting is also a process of catching air.
Reply #32009-03-15
If the temperature is not enough at the beginning, if you want to produce 1.0MPa steam, another way to vent is to cool down the process gas:) When the steam to be generated needs to be vented into the pipe network, it must be vented after the steam is qualified.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.