Do I still need to enter the welder’s ID?

2009-03-15View Original

Thread Content

Previously, after pipeline welding was completed, it was necessary to mark the weld site with the welder’s stamp at a distance of about 50 mm from it; it seems that using such stamps is no longer recommended nowadays. Please share your practices.
Reply #22009-03-15
Our approach is to, after the pipeline welding is completed, mark the welder’s ID, welding date, and weld joint number on one side of the weld joint using an oil-based marker, to facilitate non-destructive testing and inspections by various parties.
Reply #32009-03-16
Sometimes, welder numbers are marked by region
Reply #42009-03-16
If the method of using labels combined with line diagrams is employed, those labels will inevitably fade over time. So, in the event of a leak in underground pipelines in the field, how can it be determined which welder is responsible? It’s not possible to dig up all the pipelines just to check the serial numbers of their welds. Are there any specific guidelines regarding the identification of welders?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.