HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Nitrogen sealing for methanol intermediate tank

2009-03-15View Original

Thread Content

In our intermediate tank area, there is one crude methanol storage tank and two intermediate tanks for refined methanol, each with a capacity of 500 cubic meters; they all have fixed roofs. However, during the design phase, the design team connected the nitrogen pipelines only at the boundary area, with no piping installed inside that area. Is it necessary to install pipelines for nitrogen sealing?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.