Rules: 1. If you want to answer immediately, please give a score of +1 wealth to floor 1 and write your answer in the “Reason for action” field (only the content inside the parentheses); see the diagram below for details. 2. One “*” represents 1 Chinese character (or 1 digit), and the answer must match exactly to be considered correct. 3. The first person to answer correctly will receive +10 wealth points; please reply in the replies on floor 2 and below to claim the reward ; 4. The scope of questions covers the commonly used standards and experience manuals for the process and piping fields ; 5. The difficulty level of the questions increases from easy to difficult. 6. Lower-grade students are welcome to participate actively. Question for this issue: 012. The distance between the edge of the support/bracket and the pipe weld should not be less than (**) mm, and the distance from it to the pipe welds of (*****) should not be less than 100 mm. Standard answer: 50; heat treatment is required. Winner: zhangcwzj. This post was last edited by hutom123 on 2009-3-25 09:35
Reply #22009-03-16
012. The distance between the edge of the support/hanger and the pipe weld shall not be less than (50) mm, and the distance from it to the welds of pipes that require heat treatment shall not be less than 100 mm.
Reply #32009-03-16
012. The distance between the edge of the support/bracket and the pipe weld should not be less than (50) mm, and the distance from it to the welds on pipes that require heat treatment should not be less than 100 mm
Reply #42009-03-16
The distance between the edge of the support or hanger and the pipe weld should not be less than 50 mm, and the distance from it to the pipe welds that require heat treatment should not be less than 100 mm
Reply #52009-03-16
012. The distance between the edge of the support/hanger and the pipe weld shall not be less than (50) mm, and the distance from it to the welds of pipes that require heat treatment shall not be less than 100 mm.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.