HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Phase 1 of Time-Limited Quick Response Contest] 015 [Completed]

2009-03-16View Original

Thread Content

Rules: 1. If you want to answer immediately, give a score of +1 wealth to floor 1 and write your answer in the “Reason for action” field (only the content within parentheses); see the diagram below for details. 2. One “*” represents 1 Chinese character (or 1 digit), and the answer must match exactly to be considered correct. 3. The first person to answer correctly will receive +10 wealth points; please reply in the replies on floor 2 and below to claim the reward ; 4. The scope of questions covers the commonly used standards and experience manuals in the fields of process engineering and piping ; 5. The difficulty level of the questions increases from easy to difficult. 6. Lower-grade students are welcome to participate actively. Question for this issue: 015. For buried pipes with thermal displacement, retaining piles can be installed provided that the pipe’s strength permits; otherwise, (*******). Standard answer: Implement thermal compensation measures. Winner: AAA12. This post was last edited by hutom123 on 2009-3-25 09:38.]
Reply #22009-03-16
For buried pipes subject to thermal displacement, retaining piles can be installed provided that the pipe’s strength allows it; otherwise, thermal compensation measures should be adopted
Reply #32009-03-16
For buried pipes subject to thermal displacement, retaining piles can be installed provided that the pipe’s strength permits; otherwise, thermal compensation measures should be taken.
Reply #42009-03-16
For buried pipes subject to thermal displacement, retaining piles can be installed provided that the pipe’s strength allows it; otherwise, thermal compensation measures should be adopted
Reply #52009-03-16
For buried pipes subject to thermal displacement, retaining piles can be installed provided that the pipe’s strength allows it; otherwise, thermal compensation measures should be adopted
Reply #62009-03-16
I have a minor question: In which book does this sentence appear? You looked for several books but couldn’t find any? :loveliness:
Reply #72009-03-16
015. For buried pipes subject to thermal displacement, retaining piles can be installed provided that the pipe’s strength permits; otherwise, thermal compensation measures should be taken.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.