HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Precautions for on-site tower construction

2009-03-16View Original

Thread Content

On-site fabrication of a stainless steel composite plate tower (66 meters high, 10 meters in diameter) – what issues should be taken into consideration during the fabrication process? How should the shrinkage of welds be considered? Are there any relevant materials I can refer to? How are segmented lifting lugs calculated? How is straightness and roundness controlled? How to remove the cladding from the welded area between the cylinder and the internal components? How should the sequence of welding be arranged?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.