rule: 1. If you want to answer, please give +1 wealth score to the 1st floor, and write your answer in the "reason for operation" (only the content in brackets), see the picture below for details: 2. one“ * ”It only represents 1 Chinese character (1 number) and must match the answer completely to be considered a correct answer. 3. The first correct answer will get +10 wealth. Please reply on the 2nd floor and below to receive the reward. ; 4. The scope of the questions is common specifications and experience manuals in the process and pipeline professions. ; 5. The difficulty level of the test questions increases from easy to difficult. 6. Lower grade students are welcome to actively participate. Questions for this issue: 023. According to SH3501-2002, the gas pipeline test pressure is ( * * * * * * * * * ). Standard answer: 1.15 times design pressure winner: zhangcwzj This post was last edited by hutom123 on 2009-3-25 09:48 ]
Reply #22009-03-17
SH3501-2002 Petrochemical Toxic and Combustible Media Pipeline Engineering Construction and Acceptance Specifications The following conditions must be met for air pressure tests: 1. Pipe systems with a nominal diameter less than or equal to 300MM and a test pressure less than or equal to 1.6MPa. 2. Pipe systems with a nominal diameter greater than 300MM and a test pressure less than or equal to 0.5. 3. Pipeline components of brittle materials that have not passed the hydraulic test shall not participate in the gas pressure test of the pipeline system. 4. When a piping system that does not meet 1> and 2> must be replaced by a pneumatic test, all its welded joints must pass non-destructive testing. Article 3 is a mandatory requirement and must be followed. Test pressure = 1.15 design pressure.
Reply #32009-03-17
I came late and didn’t get it. Now I’ll add the following two points after already answering.: 1. When conducting gas pressure tests, air or other non-toxic and non-flammable gas media must be used for pre-tests. The pre-test pressure should be selected in the range of 0.1 MPa~0.5 MPa according to the gas pressure test pressure. 2. When testing gas pressure, the test temperature must be higher than the brittle transition temperature of the metal material.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.